
current trackmaps
Current tramway trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
weitere Pläne
- 16.08.2024
Plans for the new line under the railway station updated. - 11.12.2021
New line to Königsbrunn inaugurated - 26.02.2021
Proposed Line 5 added. - 29.09.2019
Line to Königsbrunn under construction. - 02.02.2019
Several stops renamed. - 31.03.2018
Several stops renamed.
profile
network data tramway | |
inauguration: | 08.05.1881 |
track gauge: | 1000 mm |
overhead wiring: | 600 VDC |
operator: | Augsburger Verkehrsgesellschaft (AVG) |
network, total length: | 40,6 km |
rolling stock (2012) | |
trams: | 70 |
trams withdrawn from use: | 20 |
trailers withdrawn from use: | 16 |
historic trams: | 1 |
units needed for regular service | |
regular service: | 75 |
during reconstruction of Königsplatz: | 40 |
partly estimated |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de