current and upcoming projects
- 
      
Luas Finglas
Verlängerung der Green Line nach Finglas mit drei neuen Haltestellen.
Genehmigungsverfahren | proposed inauguration: 2031
drawn on the trackmap | website 
Short-time construction works with no effect on the trackmap are not listed here.
| network data LUAS | |
inauguration:  | 30.06.2004 | 
track gauge:  | 1435 mm | 
overhead line:  | 750 VDC | 
stops:  | 54 | 
operator:  | Transdev | 
network, total length:  | 36,5 km | 
| rolling stock | |
trams:  | 66 | 
- 23.02.2025
Proposed line extension to Finglas added. - 06.06.2020
New tracks at Sandyford depot added. - 10.12.2017
Extension of green line to Broombridge opened. - 23.12.2016
New Trackmap added. 
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
      Updates of the maps will be done about every month. You will get a message when the update is done.
      
via e-mail:
gleisplan@web.de
 deutsche Version