Le Havre

deutsche Version

 

trackmaps

current and upcoming projects

    Short-time construction works with no effect on the trackmap are not listed here.

  • Linie C

    Neubaustrecken ab der Innenstadt nach Vallée Béreult und Montivilliers.
    in Bau | proposed inauguration: 2027
    drawn on the trackmap | website

network data tramway
inauguration:
12.12.2012
track gauge:
1435 mm
overhead wiring:
750 VDC
operator:
CTPO (Veolia Transdev)
network, total length:
13 km
lines:
2
stops:
23
rolling stock (2018)
trams:
22
  • 09.06.2025
    Map revised and under construction line C added.
  • 02.04.2018
    new trackamp added

Found a mistake?

You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.

Updates of the maps will be done about every month. You will get a message when the update is done.



via e-mail:

gleisplan@web.de

Home    All maps    Trackmaplist    projects    Links    Legal Notice    Data Privacy Policy    Software