
current trackmaps
current trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
weitere Pläne
- 01.03.2023
Plans for the Regionaltangente West updated. - 05.09.2022
New track connection at Heddernheim. - 11.04.2021
New tracks at Gutleut depot. - 09.01.2021
New depot Oberursel in operation. - 29.06.2020
New yard in Oberursel under construction. - 06.10.2019
Several planned lines added.
profile
network data tramway | |
inauguration: | 19.05.1872 |
track gauge: | 1435 mm |
overhead wiring: | 600 VDC |
operator: | Verkehrsgesellschaft Frankfurt (VGF) |
network, total length: | 63,6 km |
stops: | 127 |
rolling stock (2012) | |
trams: | 105 |
metro cars: | 18 |
historic trams: | ~20 |
units needed for regular service: | 89 |
network data Metro | |
inauguration: | 1968 |
track gauge: | 1435 mm |
overhead wiring: | 600 VDC |
operator: | Verkehrsgesellschaft Frankfurt (VGF) |
network, total length: | 65 km |
rolling stock (2012) | |
metro cars: | 270 |
units needed for regular service: | 72 |
partly estimated |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de